We sweat the details.

Maryland BioEnergy Center | Jessup, MD

Stewart & Tate Construction was selected to serve as construction manager for an anaerobic digestion (AD) facility in Jessup, MD, for Bioenergy Devco. After the initial sitework of mass grading of the site and installation of storm drainage, sanitary sewer and water mains, Stewart & Tate Construction commenced the construction of below-grade tanks and pits, on-site wastewater treatment facility, ground improvement work for foundation bearing, and the base slabs for the fermenter tanks. Erection of a pre-engineered metal building followed foundations, with all applicable process piping and mechanicals to support the facility’s operation. Finally, curbs, paving and bio-retention areas were then constructed.

Comprised of approximately 32,000 SF of processing building space and 7,800 SF of administrative space on a 4.75 acre site, this AD facility will transform organic waste once destined for incineration or already crowded landfills into renewable gas using microorganisms. The facility has the capacity to process 110,000 tons of waste per year and is co-located with the Maryland Food Center Authority, a major food distribution hub.

« »