We sweat the details.

New Transmission Building for Met-Ed

July 24, 2020 – Stewart & Tate Construction recently completed construction of a 35,000 SF pre-engineered building for a truck storage and maintenance facility for Met-Ed in Reading, PA. In addition to construciton, the project also included all sitework, compaction grouting, and the expansion of two existing parking lots. The building features administrative space, a lunch room, outside storage under a canopy, and a wash bay with an overhead crane.

« »